Anodizing
For suitable aluminum alloys. Grade, temper and pretreatment affect color. Specify oxide type, thickness, sealing and masking of electrical contacts.
Evaluate anodizing, coatings, polishing and marking around the substrate, service environment and assembly requirements. Define color, texture and protection before production.
Confirm substrate and use first, then process, samples and acceptance criteria. Color, thickness, corrosion performance and lead time require project review.
For suitable aluminum alloys. Grade, temper and pretreatment affect color. Specify oxide type, thickness, sealing and masking of electrical contacts.
Primarily for metal parts that tolerate curing temperatures. Select the powder system for the environment; specify thickness, texture and masking of threads, grounds and fits.
Select the coating system for substrate, corrosion protection, conductivity or appearance. Specify pretreatment, thickness and tests; assess hydrogen embrittlement for high-strength steels.
Use mechanical or electrochemical methods suited to the substrate. Define grain direction, roughness and a reference sample; account for material removal at edges and critical dimensions.
For logos, text and traceability. Confirm vector artwork, location, contrast and durability. Validate laser interaction with existing coatings first.
Match primer and topcoat to metal or plastic. Review adhesion, cure temperature, color and gloss; printed resins need compatible paint and confirmed cleaning and curing.
Evaluate anodizing, coating or mechanical finishing. Alloy and batch differences can affect color.
Evaluate plating, coating or polishing against protection and appearance needs. Agree stainless passivation separately.
Confirm alloy grade, casting porosity and pretreatment before choosing plating or protective coatings.
Check heat resistance, solvent compatibility and adhesion. Metal finishing routes do not transfer automatically.
Provide drawings, material grade, quantity, target finish, color or sample, thickness, masking, inspection criteria and target date. Price and lead time are confirmed after review.
Supply a color code and physical reference. Specify appearance faces, gloss, grain direction and allowable rack marks.
Define dimensions before and after finishing, tolerances, threads and fits. Allowances differ by process.
Mark electrical contacts, grounds, seals, bonding and assembly areas that must retain bare substrate.
Agree measurement locations, adhesion or corrosion test methods and acceptance conditions, protective packaging and traceability.
Upload 3D models and necessary 2D drawings. Specify quantity, material, tolerance, finish and target delivery.
Review manufacturability, critical dimensions and inspection requirements. Discuss complex needs with engineering.
Manufacture to the confirmed revision and check parts against the agreed inspection requirements.
Use feedback to refine the design or reorder. Confirm changes to revisions, quantities and delivery dates.
Confirm substrate and use first, then process, samples and acceptance criteria. Color, thickness, corrosion performance and lead time require project review.
Submit drawings for reviewNot sure about material, process or finish? Share drawings and operating conditions to give the engineering review a clear starting point.
Design guidelinesNo. Substrate, texture, thickness, gloss and lighting affect appearance. Use approved physical samples and agreed viewing conditions for critical finishes.
No. Review material grade, geometry, temperature resistance, pretreatment and service environment before selecting the system.
Yes. Coatings may add thickness and polishing removes material. Anodizing consumes substrate while growing an oxide layer; review tolerances and masking for the chosen process.
Provide drawings, material grade, quantity, target finish, color or sample, thickness, masking, inspection criteria and target date. Price and lead time are confirmed after review.
Provide drawings, material grade, quantity, target finish, color or sample, thickness, masking, inspection criteria and target date. Price and lead time are confirmed after review.